Type to search

Dry screed

Of course, every owner wants his home to be well-maintained and look quite presentable. You need to start ennobling from the basics - from the floor. In order for the flooring to retain its original appearance and serve its faithful service, the first thing to do is to carry out a number of preparatory works correctly and efficiently.First, we form a reliable, flat surface. To achieve this, a screed is usually made - it can be wet and dry. Wet screed is the filling of the floor with liquid concrete. This process is time-consuming and involves the use of additional equipment.In this article, the dry screed method is considered - it is the laying of special sheets on insulating materials. This material is quite light and its installation is quite simple and does not require special skills.If the room was already in operation, then we pre-remove the old coating, right up to the base. If gaping cracks are found between the floor slabs, then they need to be sealed with cement mortar. We remove dirt and debris, we will need a clean surface. After that, we determine the height to which it is planned to raise the floor, and make marks around the perimeter.The next stage is very important - we lay the waterproofing in such a way that the edges go to the walls beyond the future floor level - about 5-7 cm, this will be enough. Then, around the perimeter of the room, we fasten strips of thin mineral wool equal to the height of the future screed - this is necessary to prevent possible thermal deformations of the floor.The time has come for the embankment - expanded clay with a fraction of up to 5 mm is best suited for these purposes. We level the surface with a long straight rail - a rule that is usually used for plastering walls. To align the surface as much as possible, you will need to install beacons. We finish leveling the surface, and begin to lay the sheets from the front door.In order not to damage the smooth surface of the embankment, you will need a small piece of durable material on which you could stand to lay the sheets, one by one. The joints are fixed with screws with a step size of 5 cm. Dry screed will save time spent on repairs.After the screed sheets are laid and securely fastened, you can walk around the perimeter and use a stationery knife to cut off the protruding ends of the waterproofing. That's all - the preparatory stage is completed, you can continue further finishing work. The concept of payment availability is something that gamblers are the most interested in since some players in the UK are worried whether a minimum deposit £1 casino supports their preferred payment methods. www.1pounddepositcasino.com/ Although it is obvious that most casino minimum deposit £1 platforms allow players to choose from a few variants, £1 is still an insufficient sum for most payment methods to proceed with a transaction. That’s why we will now shed light on the available cash-in options of the £1 minimum deposit casino in the UK.
Tags:
e37fb34c67045aca4578b09a28c0e286